  • This report gives information about the project status. Whether it is On track, Off track, or At risk.

  • For Story points and Issue count:

    • If we have less than 85 - 89% issues/story points completed - At risk.

    • If 90 - 100% of issues/story points completed - On track.

    • If we have less than 85% - Off track.

  • For Remeining estimate:

    • Off Track: If the remaining estimate completion is less than 85%.

    • On Track: If the remaining estimate completion is more than 90%.

    • At Risk: If the remaining estimate completion is in the range of 85-90%.

...

  • While hovering the line tooltip appears. It shows the selected date (one the user is hovering over), guideline (showing the planned amount of completed values till the chosen moment), and unresolved value (amount of left values till the setting due date).

  • Labels on the line can be added and removed. While they are added the user can see the number of tasks created or resolved at a certain moment.

  • The report is built considering all issue types.

...

The Project field is required. It lets the user choose from which project issues will come from. By default, it is set as a project where the app was opened.

Component(s) lets the user choose component(s) of a project which lets the user get the tickets related to it.

...

Duration fields are required. There user can choose a start and end date in a datepicker. Out of this will be defined a timeframe. The minimum timeframe can be 2 days, maximum - 3 2 months.

Some specifics about duration in case of choosing Sprint in DataSource:

  • If there is a start date and end day set for Sprint and a duration (except for custom), the end day will be calculated based on them, they will be automatically set in the duration field.

  • If a custom duration is selected, the start date and end date will be taken only if they have been specified in Sprint.

  • In case dates haven`t been specified, the user has to select them in the Duration fieldsfield.

Some specifics about duration in case of choosing Version in Data Source:

  • If the Version has a start and end date it will be set in Duration fields.

  • If the Version has a start date and the end date is absent, in duration field will be shown the start date. In that case, user has to specify the end date.

  • If the Version has an end date and the start date is absent, in duration field will be shown the end date. In that case, user have to specify the start date.

The Metric field is required. It lets the user choose the metric of the key performance indicator by which the report will be calculated. For example: Issue count, Story points, and Remaining estimate. The default value for this field is Issue count.

The Include weekends toggle provides the user the possibility to include or exclude weekends while building a report.

...

Manage the visual appearance and presentation of the report, including the visibility of specific elements and the formatting of data.

...

Period lets the user select the time unit to customize the displayed data on the report. By default, it is set as days.

Some specifics for choosing the period:

...

If the user selects days, it will be shown as weekday and date. An example: Fri, Jan 12.

...

The Show label toggle enables/disables the dots that indicate a chosen period value.

...