Specific functionality:
On the report card user is able to change can switch Sprints. There is a dropdown that shows all Sprints related to the chosen board. Moreover, it shows active, future, and completed sprints. Additionally, you can choose Current Active Sprint, which will make the report dynamic. This option will always show an active sprint. User is able to switch sprints using the right left arrowsSprint with the status active.
At the top from the left side, there is a the total value of every user compared to the sum of the capacity of each user.
The report contains the board name of the chosen one at the top. By clicking on it, you will be redirected to this board in Jira.
While hovering the bar, a tooltip appears. It shows capacity, assigned workload, available workload, and excessive workload. For cases when user didn`t specified capacity, the report will show only Assigned workload for users.
If the capacity is 0, it is not shown on the report. In this case, all bars are going to be the same color due to the hub color theme.
...
By clicking on the bar, the sub-table will be open. It shows all issues assigned to the chosen Jira user and related to the selected sprint. This table also contains the total number of issues for this user within selected configurations and a link to the list of these issues on in Jira (View in issue navigator).
...
The report has 4 tabs of configurations: Data source, Parameters, Sub-tableSubtable, Description.
Data source
...
In this tab, the user has to choose a Sprint board and a Sprint from the chosen board.
Parameters
...
Open issues: shows the number of open issues in the Sprint.
Story Point: shows the units for expressing an estimate of the overall effort required to resolve all issues in a Sprint.
Original Estimate: shows the estimated time that that Jira user has specified for the tasks in the Sprint.
Remaining Estimate: shows the time that is left to complete the tasks from the Sprint from the original estimate.
Issues assigned: shows the amount of issues assigned to Jira users in a chosen Sprint.
After choosing the Board this field will be automatically set, but you still can change it.
Sprint capacity sets the amount of work that each team member can commit to completing a sprint. By default, the value is 0. When the value is 0, it will not be shown in the report.
...
Subtable
This tab lets user manage the display of columns in a sub-table subtable by adding, removing, or rearranging them.
...