This report is called Workload per sprint, In this report we are comparing users original estimate, story points or remaining estimate to the capacity that the user specify in a single sprint
X-axis shows the time logged
Y-axis shows the users
On the heading of the report we have inputs for the users to enter
First select box allows users to select which sprint
Second select box allows users to select which Estimate they want Story points, Original Estimate or Remaining Estimate
Third select box allows to choose the users, we can choose 'All' or a single user
Lastly we have capacity which lets us specify the capacity of a certain user or users and compare with their total logged story points, original estimate or remaining estimate
The specified capacity is displayed in an orange vertical line on the graph
And the bar shows the total time logged, if the total time logged is less than the specified capacity
it will show the remaining time before reaching the capacity
And if the the total time logged is above the capacity it will show the hours that are over the capacity