Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Report Usage

This report comes in the form of bar chart report. It can be used for SCRUM teams. It represents the workload of Jira users who have any workload for chosen sprint. On the Y-axis user can see the numerical representation of the selected value and on the X-axis the user can see names of Jira users.

Frame 3283.png

Specific functionality:

  • On the report card user is able to change Sprints. There is a dropdown that shows all Sprints related to chosen board. Moreover it shows active, future and completed sprints.

  • At the top there is a total value from every user compared to seted capacity.

  • Report contains the board name of chosen one at the top. By clicking on it, you will be redirected to this board in Jira.

  • While hovering the bar, tooltip appears. It shows capacity, assigned workload, available workload, excessive workload.

  • If the capacity is 0, it is not shown on the report. Bars are going to be the same color in this case.

Frame 3367.png
  • By clicking on the bar, sub-table will be open. It shows all issues assigned to chosen Jira user and related to selected sprint. This table also contains total number of issues for this user within selected configurations and a link to the list of this issues on Jira (View in issue navigator).

Frame 3284 (1).png

Setting up a report

Report has 4 tabs of configurations: Data source, Parameters, Sub-table, Description.

Data source

In this tab user have to choose Sprint board and a Sprint from chosen board.

Снимок экрана (745).png

Parameters

In this tab user have to set up “Users to display“, “Workload type“, “Sprint capacity“.

Снимок экрана (746).png

“Users to display“ let user to choose Jira users whose workload to show in the report. This dropdown contains only users with present workload for selected Sprint. By default it shows all users who have a workload for Sprint.

“Workload type” field is required. There is few options:

  • Story Point: shows the units for expressing an estimate of the overall effort required to resolve all issues in a sprint.

  • Original Estimate: shows the estimated time that that user has specified.

  • Remaining Estimate: shows the time that is left to complete the task from original estimate.

“Sprint capacity“ set the amount of work that a each team member can commit to completing a sprint. By default the value is 0. When the value is 0, it will not be shown in report.

Sub-table

This tab let user manage the display of columns in a sub-table by adding, removing, or rearranging them.

Снимок экрана (748).png

“Columns” block give a user possibility to customize the sequence of columns to suit your preferences for a personalized view of data.

“Custom fields” is a multiselect field. It allow user to add additional fields to sub-table columns.

Description

Description let user add any additional information less than 500 characters about created report.
The description will be presented directly on the report card (in case of its presence).

Снимок экрана (749).png

  • No labels